Options
MILP-Formulations for the Total Adjustment Cost Problem
Abstract
In this paper, we present MILP-formulations for project scheduling problems subject to general temporal constraints, where the fluctuation of resource utilizations within the project duration is to be minimized (resource leveling). Particularly, we consider a resource leveling objective function that coincides with the cumulative costs arising from increasing or decreasing the requirements of resources. The resulting “total adjustment cost problem” has achieved little attention in the literature, although it seems to be of considerable importance in real-life applications. A comprehensive performance analysis is provided showing that medium- as well as large-scale instances can be solved to optimality using CPLEX 12.4.
Publication Type
ConferencePaper
Author
Editor • • • • • • • •
Helber, Stefan
Breitner, Michael
Rösch, Daniel
Schön, Cornelia
Graf von der Schulenburg, Johannes-Matthias
Sibbertsen, Philipp
Steinbach, Marc
Weber, Stefan
Wolter, Anja
Date Issued
2014
Faculty
Externe Einrichtung
Institute / Institution
Externe Einrichtung
Conference
International Annual Conference of the German Operations Research Society (GOR), Hannover, 05.09.-07.09.2012
Publisher
Springer
Publisher Place
Cham
Series Name
Operations Research Proceedings 2012
ISBN
978-3-319-00794-6
HilPub short link